Construction offsets

A point to be staked can be offset by a horizontal or a vertical offset.

During stakeout a construction offset is indicated by a green line, with the double circle indicating the selected position adjusted for the specified construction offset(s).

When you define a construction offset for an alignment, the offset is:

  • used for all alignments in the same job.
  • used for all subsequent surveys of the alignment in the same job, until a different construction offset is defined.
  • not used for the same alignment when it accessed from a different job.